Finch Module

component/systeem

Multifunctional CLT module

Finch Module
0.8

A Finch unit was cut in half for the purpose of daylighting.

After placing the Finch modules.

Lifting Finch Module on the GTB Lab deck.

The steel profiles on the bottom of the module are placed on the intermediate timber structure.

Previous life of Finch unit as a home in the East of Netherlands.

Samenvatting

Finch units are cross-laminated timber (CLT) units produced by De Groot Vroomshoop.

Details

The unit has been used as a home and reused as a demonstration space in the GTB Lab. The unit has been sawn in half to create a light space in the centre. Daylight is an important indicator of the transformability of buildings. Unlike reinforced concrete, CLT is relatively easy to cut. After reconnecting the installations of both halves, it functions as a demonstration space.

Ontwerp

Finch Buildings

Producent

De Groot Vroomshoop

Productielocatie

De Groot Vroomshoop Groep B.V., Zwolsekanaal, Vroomshoop, Nederland

Industrieconsortium

De Groot Vroomshoop, Aveco de bondt, Nieman Groep, Loohuis installlatiegroep, Rockstart, De Mors

Afmetingen

Lengte:

Breedte:

Hoogte (diepte):

Dikte:

Oppervlak:

Volume:

4 410 mm + 4 065 mm

3 553 mm

3 697 mm

30,11 m2

111,32 m3

Schadelijke stoffen

Geen

Geschiedenis

2014 - produced in Enschede NL and used as a home
2021 - reused at GTB Lab

Circulariteitsgegevens

Reversible BIM: the 3D color-coded model visualizes the reuse potential per element.
RP Product legend.png

Gewicht:

Opgenomen CO2:

15,36 ton

34,63 ton CO2

Hergebruikpotentieel:

Terugwinningsopties:

0.8

Reuse by minor repair

Hergebruikt gewicht:

Hergebruikte CO2:

9,7 ton

23,7 ton

Aantal elementen:

Aantal demontagestappen:

80

10

Resterende Technische Levenscyclus:

65 jaar

Circulariteitsprofiel

Verhouding van Hergebruikpotentieel na bewerking.

Tonnage

gtb lab phase 1 - circularity profile tonnage.jpg

CO2

gtb lab phase 1 - circularity profile tonnage.jpg

Materiaal per terugwinningsoptie

Verhouding van Hergebruikpotentieel.

Tonnage

gtb lab phase 1 - tonnage recovery option.jpg

CO2

gtb lab phase 1 - carbon recovery option.jpg

Hergebruikte materiale per functie en per terugwinningsoptie

Tonnage

gtb lab phase 1 - tonnage avoided waste.jpg

CO2

gtb lab phase 1 - carbon avoided waste.jpg

Verdeling van materialen

Tonnage

gtb lab phase 1 - tonnage material distr.jpg

CO2

gtb lab phase 1 - carbon material distr.jpg

Overzicht van materialen per terugwinningsoptie

Tonnage

gtb lab phase 1 - tonnage overview materials.jpg

CO2

gtb lab phase 1 - carbon overview materials.jpg

Deel deze pagina

Finch Module

chart.png