Steel Core

component/systeem

Reversible steel frame

Steel Core
0.6

November 2021, finished.

Samenvatting

The steel structure acts as the main vertical load-bearing part of the GTB Lab. The over-dimensioning means that future transformations will not be a problem.

Details

The design of the load-bearing part of the GTB Lab 'core' is oversized to allow future adaptations to be connected to the steel frame. It is built entirely with nuts and bolts to be reversible.

The steel structure is strategically located in the centre of the building. This allows changes to be made to the sides and supports the ability to bring daylight and fresh air into the centre of the building.

Ontwerp

4D Architects

Producent

Andy Tullemans Constructiebedrijf B.V.

Productielocatie

Franklinstraat 8, Weert, The Netherlands

Industrieconsortium

Andy Tullemans Constructiebedrijf B.V.

Afmetingen

Lengte:

Breedte:

Hoogte (diepte):

Dikte:

Oppervlak:

Volume:

12 200 mm

4 700 mm

2 500 mm

11,75 m2

143,35 m3

Schadelijke stoffen

Geen

Geschiedenis

2021 - produced and assembled by Tullemans

Circulariteitsgegevens

Reversible BIM: the 3D color-coded model visualizes the reuse potential per element.
RP Product legend.png

Gewicht:

Opgenomen CO2:

13,35 ton

20,69 ton CO2

Hergebruikpotentieel:

Terugwinningsopties:

0.6

Reuse by major repair

Hergebruikt gewicht:

Hergebruikte CO2:

Aantal elementen:

Aantal demontagestappen:

84

Resterende Technische Levenscyclus:

96 jaar

gtb lab phase 1 - circularity profile tonnage.jpg

gtb lab phase 1 - circularity profile tonnage.jpg

gtb lab phase 1 - tonnage recovery option.jpg
gtb lab phase 1 - carbon recovery option.jpg
gtb lab phase 1 - tonnage avoided waste.jpg
gtb lab phase 1 - carbon avoided waste.jpg
gtb lab phase 1 - tonnage material distr.jpg
gtb lab phase 1 - carbon material distr.jpg
gtb lab phase 1 - tonnage overview materials.jpg
gtb lab phase 1 - carbon overview materials.jpg