top of page

Rodeca Facade

component/system

Modular translucent facade system

Rodeca Facade
0.7

Intermediar aluminium profile connecting the polycarbonate panels to each other and to the load bearing frame.

Section view off the taped tongue-and-groove panels.

The narrow horizontal façade sections can be removed and provide flexibility to allow structural connections to the steel structure behind.

Summary

The Rodeca polycarbonate facade system is reversible, flexible, light weight, highly insulating, strong, weather resistant and translucent.

Details

Rodeca installed its polycarbonate panels on the GTB Lab. First the main roof, then the core and finally the circular GTB module. The material has the same insulation value as triple glazing and allows daylight into the building, but also has some advantageous reversible properties. It is not as fragile as glass and more than 10 times lighter. More importantly, the elements can be assembled and disassembled quickly, easily and with a minimum of waste. The reversible GTB Lab module shows that the CO2 emissions per m2 of facade are 2.5 times lower for the polycarbonate panel than for glass, not to mention the CO2 emissions avoided due to the lighter supporting structure.

Design

Rodeca

Manufacturer

Rodeca Gmbh

Manufacturing location

Freiherr-vom-Stein-Straße 165, Mülheim an der Ruhr, Germany

Industry consortium

Rodeca Systems BV

Dimensions

Length:

Width:

Height (or depth):

Thickness:

Area:

Volume:

12 390 mm

15 000 mm

150 mm

2,25 m2

26,1 m3

Hazardous materials

None

History

2021 - produced by Rodeca and assembled in GTB Lab, Heerlen NL

Circularity data

Reversible BIM: the 3D color-coded model visualizes the reuse potential per element.
RP Product legend.png

Embodied mass:

Embodied carbon:

3,90 ton (22,52 kg/m2)

9,07 ton CO2 (52,47 kg CO2/m2)

Reuse Potential:

Recovery option

0.7

Reuse by minor repair

Reused mass:

Reused carbon:

2,73 ton (15,76 kg/m2)

6,35 ton CO2 (36,72 kg CO2/m2)

No. of elements:

No. of disassembly steps:

394

Remaining Technical Life Cycle:

70 year

gtb lab phase 1 - circularity profile tonnage.jpg

gtb lab phase 1 - circularity profile tonnage.jpg

gtb lab phase 1 - tonnage recovery option.jpg
gtb lab phase 1 - carbon recovery option.jpg
gtb lab phase 1 - tonnage avoided waste.jpg
gtb lab phase 1 - carbon avoided waste.jpg
gtb lab phase 1 - tonnage material distr.jpg
gtb lab phase 1 - carbon material distr.jpg
gtb lab phase 1 - tonnage overview materials.jpg
gtb lab phase 1 - carbon overview materials.jpg

Share this page

Rodeca Facade

chart.png
bottom of page