Steel Core

component/system

Reversible steel frame

Steel Core
0.6

November 2021, finished.

Summary

The steel structure acts as the main vertical load-bearing part of the GTB Lab. The over-dimensioning means that future transformations will not be a problem.

Details

The design of the load-bearing part of the GTB Lab 'core' is oversized to allow future adaptations to be connected to the steel frame. It is built entirely with nuts and bolts to be reversible.

The steel structure is strategically located in the centre of the building. This allows changes to be made to the sides and supports the ability to bring daylight and fresh air into the centre of the building.

Design

4D Architects

Manufacturer

Andy Tullemans Constructiebedrijf B.V.

Manufacturing location

Franklinstraat 8, Weert, The Netherlands

Industry consortium

Andy Tullemans Constructiebedrijf B.V.

Dimensions

Length:

Width:

Height (or depth):

Thickness:

Area:

Volume:

12 200 mm

4 700 mm

2 500 mm

11,75 m2

143,35 m3

Hazardous materials

None

History

2021 - produced and assembled by Tullemans

Circularity data

Reversible BIM: the 3D color-coded model visualizes the reuse potential per element.
RP Product legend.png

Embodied mass:

Embodied carbon:

13,35 ton

20,69 ton CO2

Reuse Potential:

Recovery option

0.6

Reuse by major repair

Reused mass:

Reused carbon:

No. of elements:

No. of disassembly steps:

84

Remaining Technical Life Cycle:

97 year

gtb lab phase 1 - circularity profile tonnage.jpg

gtb lab phase 1 - circularity profile tonnage.jpg

gtb lab phase 1 - tonnage recovery option.jpg
gtb lab phase 1 - carbon recovery option.jpg
gtb lab phase 1 - tonnage avoided waste.jpg
gtb lab phase 1 - carbon avoided waste.jpg
gtb lab phase 1 - tonnage material distr.jpg
gtb lab phase 1 - carbon material distr.jpg
gtb lab phase 1 - tonnage overview materials.jpg
gtb lab phase 1 - carbon overview materials.jpg